The Trees Are Lit For The Holidays (posted 11.30.23)

t
t

Near Term Site Work Complete (posted 9.29.23)

cleared site from RI spot look west
drone photo swept
north from pier
toward MYC.

Demolition is Almost Complete (posted 7.28.23)

demo

Demolition and sorting

demo

Demolition in progress

m

Runoff control

Dust control during demolition

Constructive Reuse - Materials to be Recycled (posted 7.28.23)

reuse
ru
reu
ru
ru
ru

Timber to be repurposed

b
b
b

Boilers get a second life at a Maine plywood manufacturing facility.

Abatement and Containment (posted 7.28.23)

office

Temporary office space set up on the 1st floor of the Cannery Building.

containmment

View within the containment area prior to floor tile abatement.

after

Bean Building 5th floor R&D lab area after abatement of floor tile was completed.

Wall panels with asbestos

Wall panels with asbestos shown before, and after abatement and removal.

sorted

Nonhazardous material is sorted prior to removal. 

Trailer parked for waste removal.

Trailer parked for waste removal. Abated material is moved in carts to the loading dock area for removal.

Portland Fire Department truck parked outside building

Portland Fire Department continuing training on-site, currently isolated to the easternmost warehouse.

Items of Historical Interest to be Preserved (posted 7.28.23)

image of antique bean stirrer

Stirring spoon

antique metal Portland Company door

The Portland Company door

bollard

Bollard originally located on the pier in 1913

cobble

Remnants of an old cobblestone street, likely Water Street

pots

Historic bean pots

Please reach out if you have questions or would like a one on-one-meeting.

info@rouxcampusportland.org