Demolition and sorting
Demolition in progress
Runoff control
Dust control during demolition
Timber to be repurposed
Boilers get a second life at a Maine plywood manufacturing facility.
Temporary office space set up on the 1st floor of the Cannery Building.
View within the containment area prior to floor tile abatement.
Bean Building 5th floor R&D lab area after abatement of floor tile was completed.
Wall panels with asbestos shown before, and after abatement and removal.
Nonhazardous material is sorted prior to removal.
Trailer parked for waste removal. Abated material is moved in carts to the loading dock area for removal.
Portland Fire Department continuing training on-site, currently isolated to the easternmost warehouse.
Stirring spoon
The Portland Company door
Bollard originally located on the pier in 1913
Remnants of an old cobblestone street, likely Water Street
Historic bean pots
info@rouxcampusportland.org